热门标签

telegram超级索引(www.tel8.vip):KPower gets four-year PPA extension for 50MW solar project

时间:4周前   阅读:3   评论:1

ug环球注册登录www.ugbet.us)开放环球UG代理登录网址、会员登录网址、环球UG会员注册、环球UG代理开户申请、环球UG电脑客户端、环球UG手机版下载等业务。

KUALA LUMPUR: KPower Bhd’s subsidiary PKNP KPower Suria Sdn Bhd (PKSSB) has obtained an extension from the Energy Commission (EC) for the development of 50MW solar photovoltaic plant in Pahang.

In a filing with Bursa Malaysia, KPower said the EC had vide their letter extended the final closing date from June 30 to Sept 30, 2022.

KPower said the scheduled commercial operation date had been extended to Dec 31, 2023, from Sept 30, 2023 while the tenure of the power purchase agreement (PPA) was from 21 years to 25 years.

,

telegram超级索引www.tel8.vip)是一个Telegram群组分享平台。telegram超级索引包括telegram超级索引、telegram群组索引、Telegram群组导航、新加坡telegram群组、telegram中文群组、telegram群组(其他)、Telegram 美国 群组、telegram群组爬虫、电报群 科学上网、小飞机 怎么 加 群、tg群等内容。telegram超级索引为广大电报用户提供各种电报群组/电报频道/电报机器人导航服务。

,

“PKSSB will execute a supplemental agreement with Tenaga Nasional Bhd to effect the aforesaid terms, where relevant, in the PPA.

“The board is of the opinion that the extension of time is in the best interest of the company,” it said.


转载说明:本文转载自Sunbet。

上一篇:Fed minutes may point to rationale for size of future rate hikes

下一篇:皇冠网址(www.hg108.vip):记者畅想湖人首发阵容:贝弗利希尔德特纳搭档詹眉

网友评论

  • 2022-09-07 00:37:34

    The firmer-than-expected midpoint lifted the spot market higher. The onshore yuan rebounded from a two-year low of 6.8704 hit a day earlier to trade at 6.8532 as of 0200 GMT.不一样的感触